Meticulous maintenance and installation considerations, ppr pipe methods to-life
Ppr pipe installation to ensure the effect of a very important role, security technology is no small matter, the construction program is very important. The following Thai Anguan Jing Pipe Co., Ltd. to bring new technology construction method.
The installation process is to take the top of the normal installation methods do not take place, it must be installed horizontally, left and right heat and cold, segment to do, convenient maintenance and installation in late.
Select the hidden installation method, hot and cold pipes to separate slot to install, install elbow on the wall to be expected that the proper height and position, try not to put the hose exposed, in order to avoid crashing.
Installed by a pressure test to a pressure of not less than 0.6MPa, the test 20-30 minutes. |